BHP Billiton Olympic Dam Tails Leach Upgrade

Value: $4m

The BHP Billiton Olympic Dam mine is located 560km North of Adelaide in South Australia. The mine is a multi mineral mine body and the world’s fourth largest copper deposit.

ICE Engineering were engaged by BHP Billiton to complete the electrical and instrumentation work associated with the Tails Leach Upgrade and SCATS Project at Roxby Downs.

ICE Engineering completed the project and met all requirements as outlined in the agreed KPI’s in relation to Safety, timing, quality and budget.

Services provided by ICE Engineering for the project included:

  • Low and Medium Voltage electrical installation
  • Instrumentation
  • High Voltage installation
  • Commissioning assistance
 

back to top